Informatization
strategy of "CFR" SA represents an active
component part of the general strategy of the company
development. It implies some objectives with influences
on a long term and other objectives with immediate effect
on the present activities.
Strategically objectives is concentrated
on:
- increasing the
level of informatization and utilization of the most
advanced information technologies;
- integration in European system of transport through
expanding of level of interoperability with other
administrators of European infrastructure;
- services of special quality for the clients in the
railway station, especially services of information
about possibilities of transport, tariffs, other
services offered by the Company;
- support for the policy of bringing of new freight
and passengers operators
Immediate objectives
are:
- to control the
costs determined by the activity of infrastructure
maintenance;
- to administrate of incomes and costs for all
Company;
- to fix on and calculate the Tax of Infrastructure
Utilization;
- to provide the elements for financial analysis, to
record and regalement of relations with customers and
suppliers;
- in order to apply the informatization strategy of
"CFR" SA in the next 3 years there will be
some major investments.
For
instance IRIS (Integrated Information System) project,
financed by BIRD, has a major importance in providing the
information support necessary for an efficient action of
Company on the transport market. IRIS system has as a
main objective to provide the informational support for
activities of exploitation and maintenance of railway
infrastructure, for financial and strategic management of
CFR.
The
system has the following fundamental principles:
-
to find
information solutions and modern equipment,
verified in use by other European railways;
-
to provide
professional technical assistance and an
efficient transfer of technology;
-
a global
informatization starting from the fundamental
activities and current practices of exploitation;
-
collection and
synthesis of the information achieved at the
fundamental levels in order to support all the
levels of, operation and strategic management;
-
to distribute the
responsibility to provide the correct
information, reengineering of activities that
will be informatizated;
-
to constitute an
infrastructure of equipment (computers, system of
data transmission) to ensure the protection of
investments.
IRIS
system will be composed from 5 subsystems (information
applications), performed in modules, integrated and
designed in a modern and open architecture.
From all 5 subsystems, the most important and
which represents about 35% of project is:
The management of Infrastructure
The Subsystem of Infrastructure
Management will cover the following activities:
- the railway
cadastre for which a modern concept of "geographical
information" (GIS Geographical Information System) will be
used;
- the administration of fixed means in infrastructure (tracks,
bridges, tunnels, building, installations, etc);
- the management of maintenance activity in infrastructure;
- the management of working units (sections of infrastructure,
departments with administration of work team, materials, work orders
etc.);
- the supervising of projects of major repairs and new constructions
(including the management of investments).
To accomplish the Management of Infrastructure subsystem, CFR will
achieve packets of special programs that exist in use in other railways
and will be adapted on the project duration at the specific conditions
and structure of CFR network.
IRIS' system supplier that will work in mixed teams with CFR
professionals will support this adaptation. In this way there will be
ensured the conditions for taking over the application after achieving
project.
All data will be recorded in a
central database, constituted on 2 levels (geographical and relational),
the rules and work procedures being the same for all users. This will
determine the same standardized type of work for the entire
organizational structure and also a more efficient control of activities
in infrastructure, of the costs, the possibility to determine the
investments and financial requests.
Instruments will be also
designated to Infrastructure Department; to determine the access tariffs
for passenger and freight operators.
Rolling Stock Management
represents another subsystem. It has the following
functions:
- the
administration of rolling stock in use in CFR;
- the management of maintenance activities;
- the administration of material stocks and
substitutes for maintenance;
- the administration of technical documentation for
rolling stock;
The
third important subsystem for Company is Monitoring
railway traffic with the following functions:
- planning the
train circulation (including integration in achieved
system of train timetable)
- supervise of circulation at central and regional
level (RC), through acquire of information from about
300 railway junctions and important stations
- administration of circulation contracts and
calculation of tariffs for freight and passenger
operators.
Monitoring railway traffic
subsystem will be accomplished by the CFR professionals
from Traffic sub-department and Information Center, under
the project and technical assistance supervising of IRIS
system' supplier. Its design will be based on a model of
similar application implemented in another railway, model
that was required to the supplier.
This
subsystem will offer to Department of Traffic a standard
instrument of planning and supervising of activities, and
also to decide the tariffs.
To complete the subsystems mentioned above a subsystem to
"Provide Information for Management" will be
design. The information for management (MIS) will be
extracted from all information activities (also from the
system of Financial-Booking Management).
Priority
will be given to the presentation of information that
will permit to CFR a rapid analysis of situation on
transport market, of its financial and operation
situation. MIS will be an instrument specially created
for the global management of the company. On the basis of
the complex network of computers and of the data
transmission infrastructure, it will be also provided the
electronic support of information exchange and documents'
administration (papers, faxes, telegrams), for email and
Internet for the entire Company.
The
Telecommunication Network of CFR is one of the first
telecommunication networks in the country.
It was
built since 40's in order to provide all types of
specific communications for railway transmission
activities. The telecommunication network of CFR, from
the point of view of the level of territorial cover and
complexity, is the second telecommunication network after
ROMTELECOM. During the years, due to the increasing of
volume of passenger and freight transport and to the
expanding of principal and secondary lines, railways
telecommunications have been strongly developing, their
structure today being as following:
Transmission
carriers:
- Network of interurban subterranean cables (Cu) 6.506
km;
- Network of urban subterranean cables (Cu) 5.114 km;
- Network of aerial lines 4.776 km;
- Cable of optical fiber Bucuresti-Ploiesti 62 km. Power transmission
systems:
- Channels of transmission on carrier current systems for
telephony, telegraphy, teleconference and data
transmission;
- SDII equipped with STM-1 for 63(2Mbps.
Data Transmission Network
- 41 stations PAD, plane typology with transmission
report X.25.
Automatic telephony exchanges, with installed
capacity 32.201 subscribers and 6.181 interconnecting
lines
- 112 automatic exchanges "step by step'
- 84 crossbar and electronic automatic exchanges
Automatic
telegraphy exchanges, with installed capacity 570
subscribers and 98 interconnecting lines
- 9 automatic telegraphy exchanges "step by
step"
Network of radio traffic
- Frequency band 146-147 MHz
- Fixed radio stations, installed in 1.334 railway
stations -3.353 pieces
- Mobile radio stations installed on railway engines and
machines of maintenance of rolling tracks and contact