ROMANIA MINISTRY OF WATERS AND ENVIRONMENT
PROTECTION
Endorsed by : Secretary of
State loan JELEV
General Directorate of
Regulations, Licenses, Environment Attestation and Waste Management
Directorate of Licensing and Attestation
Further to the application
submitted by the Institute for Railway Studies and Designs - S.A.,
registered by the Ministry of Waters and Environment Protection under no
105116/15.03.2001, further to the review and checking of the submitted
documents, Pursuant to the Law no 137/1995 on environment protection,
republished, Based on the Government Decision no 17/2001 on the
organization and functioning of the Ministry of Waters and Environment
Protection, it is issued this: AGREEMENT concerning the
execution of rehabilitation works on BUCHAREST - CONSTANTA RAILWAY LINE
making part of the pan-European Transport Corridor no IV, aiming to
provide better and safer traffic conditions_by means of increase of
safety, traffic speed and reduction of the current travel time, aiming
to ensure a fluent traffic towards the ports, major trading zones, leisure
and tourist and historical areas, under the following terms: - in
the field of water quality protection 1. all discharge water
shall be collected, drained and discharged (pluvial and waste waters) in
decanting vessels and oil products separators so as to comply with the
limits imposed by NTPA 001/97 for direct discharge in effluent drains and
by NTPA 002/97 for overflow in sewerage system as well as the limits
provided for under ST AS 4706/88 on the quality conditions for the 3rd
category of use; 2. the limits imposed by NTPA 002/97 for the overflow in
the sewerage system in case of waste water discharge from the stations on
route; 3. increased capacity overflow systems shall be located in the
immediate neighborhood of valley crossings in order to be able to collect
discharges from the railway track in the area of crossing, in case of
possible accidental pollution; 4. filter and phyto- purging retention
basins shall be located before the overflow in crossed receivers; 5.
the perturbation of natural water discharge during the execution and
operation of said objective shall be avoided; 6. any modifications of
water course dynamics and morphology further to the carried out works
shall be avoided; 7. the danger of underground water pollution shall be
eliminated by means of avoiding the loss of potential pollutant materials
and substances; 8. service contracts shall be concluded with
specialized units settling water use and discharge. - in the field of
air quality protection 1. the limits imposed by STAS 12574/87 on the
air quality conditions in protected area shall be complied with; 2.
measures to reduce the powder pollution based on an adequate transport and
handling of construction materials and excavated materials during the
works performance. - in the field of soil quality protection 1 .
construction materials shall be managed only within the work area, without
affecting neighborhood, on arranged platforms provided with perimeter ~..~
protection ditch; 2. the necessary surface of work area shall not be
exceeded; 3. vertical systematization of the railway line on slopes and
drains shall be carried out so as to ensure pluvial water course towards
pluvial water collection and directing drain along the railway
track; 4. avoidance of soil settlement and destruction; 5. lands
temporarily occupied shall be rehabilitated; 6. equipment and transport
means shall be maintained and operated in an adequate technical condition
so as to eliminate oil, fuel discharges and pollutant emission above the
admissible values; 7. the wastes of any kind shall be stored in
specially provided areas for such purpose; 8. it is forbidden to store the
materials on access roads or in areas that do not belong to the working
area; 9. service contracts shall be concluded with specialized units
aiming to ensure the wastes elimination, processing and final
storage; 10. the unguarded storage of wastes is forbidden; 11 . the
technological wastes shall be selectively collected in arranged areas
aiming to ensure valuation of re-usable wastes in specialized units for
such valuation and unloading in waste storage places in the area of the
wastes that cannot be recycled and also of domestic wastes; - in the
field of bio-diversity protection and preservation 1 . valley section
crossed by bridges shall be provided with original bushes and tree
species, on a compact strip with the minimum width adequate to the safety
area of the public railway infrastructure; 2. the access to the other
crossed sections shall be provided with original herbaceous species; 3.
the safety area of the public railway infrastructure shall be provided
with compact strips of original tree species, especially on sections
between the road infrastructure and the railway line as well as in
forestry vegetation areas that are crossed by the railway line; 4. the
damaged areas shall be renewed on works completion; - in the field of
human dwelling protection 1. discomfort factors shall be eliminated
(dust, must, noise, vibration) during the period of work execution; 2.
noise retaining panels and especially compact strips of original tree
species shall be located in the safety area of the public railway
infrastructure in the crossing sections to various localities; 3. the
limits imposed by STAS 10009/88 referring to noise pollution; 4. a
working schedule shall be set up so as to reach a minimum lack of comfort
for the residents in the area; 5. protection works against
electro-magnetic perturbation shall be carried out. 6. perturbation of
normal traffic during the period of execution shall be avoided. This
documentation includes: study on impact and report on the study on impact
(drafted by S.C. FITPOL SRL), technical specification (drafted by ISPCF
S.A.) and the following documents: . Certificate of Urbanism no
10041/X11 E/10.04.2000, issued by the City Hall of Bucharest; .
Certificate of Urbanism no 241/261/18.05.2000, issued by Ilfov County
Council; . Certificate of Urbanism no 131/11.11.1999, issued by
Calarasi County Council; . Certificate of Urbanism no 340/15.11.1999,
issued by lalomita County Council; . Certificate of Urbanism no
228/30.11.1999, issued by Constanta County Council; . Attestation no
1444/17.11.1999 issued by Dobroesti Mayor's Office; . Attestation no
1351/22.02.2000 issued by Voluntari Mayor's Office; . Attestation no
4867/17.09.1999 issued by Pantelimon Mayor's Office; . Attestation no
3378/01.11.1999 issued by Branesti Mayor's Office; . Attestation no
1091/05.11 .1999 issued by Belciugatele Mayor's Office; . Certificate
of Urbanism no 35/30.08.1999 issued by Fundulea Mayor'sOffice; .
Attestation no 885/29.07.1999 issued by Sarulesti Mayor's Office; .
Attestation no 690/03.09.1999 issued by Tamadau Mare Mayor's Office; .
Attestation no 3152/15.11.1999 issued by Nicolae Balcescu Mayor's
Office; . Attestation no 768/29.07.1999 issued by Lehliu-Sat Mayor's
Office; . Attestation no 4061/05.10.1999 issued by Lehliu-Gara Mayor's
Office; . Attestation no 4203/04.11 .1999 issued by Dor Marunt Mayor's
Office; . Attestation no 1959/12.10.1999 issued by Dragos Voda Mayor's
Office; . Attestation no 2372/29.07.1999 issued by Dragalina Mayor's
Office; . Attestation no 2089/12.10.1999 issued by Perisoru Mayor's
Office; . Attestation no 2391/12.10.1999 issued by Stefan cel Mare
Mayor's Office; . Attestation no 1130/09.11.1999 issued by Stelnica
Mayor's Office; . Attestation no 14657/09.11 .1999 issued by Fetesti
Mayor's Office; . Attestation no 151/04.08.1999 issued by Cernavoda
Mayor's Office; . Attestation no 1642/03.08.1999 issued by Mircea Voda
Mayor's Office; . Attestation no 7547/03.08.1999 issued by Medgidia
Mayor's Office; . Attestation no 1965/10.11.1999 issued by Castelu Mayor's
Office; . Attestation no 2230/11 .11 .1999 issued by Poarta Alba
Mayor's Office; . Attestation no 111/18.11 .1999 issued by Basarabi
Mayor's Office; . Attestation no 2480/11.11 .1999 issued by Valul lui
Traian Mayor's Office; . Water management endorsement notice for
exceptional situations no 249.3.1999, issued by "APELE ROMANE" National
Company; . Attestation no 1109/25.01.2000 issued by the National Forest
Company . Sanitary attestation no 78/08.06.2000, issued by the
Transport Public Health Directorate Bucharest within the Ministry of
Transport; . Sanitary attestation no 06/07.01.2000, issued by the
Transport Public Health Directorate Constanta within the Ministry of
Transport; . Attestation no 34156/15.11 .1999 issued by the General I
nspectorate of the Corps of Military Firemen; . Attestation no
ET/1799/30.08.1999 issued by the General Staff; . Attestation no
23795/25.08.1999, issued by the Romanian Intelligence Service; .
Attestation no 3326/24.11.1999 issued by the Ministry of Culture; .
Attestation no 478/09.11.1999, issued by the Romanian Academy; .
Memorandum no 79-96900-EPS/074 of the National Company NUCLEARELECTRICA
S.A., C.N.E. - PROD Cernavoda; . Principle notice no 93/192/11.01.200
of the National Administration of Roads; . Principle agreement no
810/14.02.2000 of the National Company of Shipping Canals S.A.
Constanta; . Principle notice no 208/03/020/10.05.1999 of ROMTELECOM
S.A.; . Principle agreement no 907/908/07.01.2000 of S.N.G.N. "ROMGAZ -
S.A.; . Attestation no 3010/19.09.2000 of S.C.D.G.N. DISTRIGAZ SUD S.A.
Bucharest; . Route/location attestation no 1494/20.06.2000 of S.C.
CONGAZ S.A. Constanta; . Attestation no 237/31.07.2000 of CONPET
S.A.; . Attestation no 11452/10.05.1999 of S.N.P. PETROM S.A.
Bucharest, Ploiesti PETROTRANS Branch; . Branch attestation of S.C.
ELECTRICA S.A., Ilfov, Calarasi and Constanta Distribution Branch; .
Principle agreement no 85/5098/29.11.2000 of S.C. APA NOVA Bucuresti
S.A. . Principle agreement no 4161/09.11.1999 of S.C. DETACAN S.A.
Medgidia; . Attestation no 13780/01.08.2000 of R.A.J.A.
Constanta. The environment agreement is issued under the following
terms: 1. The legal provisions in force in relation to environment and
water protection shall be complied with. 2. The statements in the
technical specification shall be strictly complied with. 3.
Recommendations included in the report on the study on impact shall be
complied with. 4. The conditions included in documents of endorsement
issued by other authorities shall be met. 5. Standards and norms in
force to ensure the exigencies on construction quality shall be complied
with. 6. Accidental pollution events shall be immediately communicated
to County Environment Protection Offices in the relevant areas. 7.
Preliminary acceptance shall be performed in the presence of
representatives of County Environment Protection Offices in the relevant
areas. 8. An environment agreement shall be requested from County
Environment Protection Offices for each site organization. 9. An
environment license shall be compulsorily requested from the County
Environment Protection Offices in Bucharest, Ilfov, Calarasi, lalomita and
Constanta. The agreement for the execution of rehabilitation works on
Bucharest - Constanta railway line contains 5 pages and is valid for a
period of 5 years from the date of issue. Failure to totally comply
with the provisions under this agreement shall cause its
cancellation.
Director, Ileana
Vasilescu
|
|